Public project: concept design
This stage is concerned with preparing a concept design for the preferred option and may also include making an application for planning permission.
The Government Construction Strategy proposes that publicly-funded projects adopt either a design and build, private finance initiative (PFI) or prime contract procurement route. These routes involve contracting an integrated supply team to design, construct and sometimes finance, operate and maintain the development. This means that concept design takes place after the integrated supply team has been appointed, although in practice a considerable amount of design can be undertaken by the integrated supply team during the tender process.
Contents |
[edit] Starting the work stage.
The client updates the project execution plan to reflect comments made at the end of the previous stage. The integrated supply team co-ordinates a start-up meeting attended by the client to receive comments made at the end of the previous stage, and to agree the programme for the stage.
The client may identify a requirement to appoint additional independent client advisers (such a contract administrator or employer's agent to administrate the contract). Go to work stage: Public project: appointment.
[edit] Preparing an initial concept design.
The integrated supply team carries out any additional site appraisals or site surveys that may be necessary.
The integrated supply team prepares an initial concept design including outline specification. The requirement for the integrated supply team to prepare design documents (such as concept design report) for the client to comment on will vary depending on what has been set out in the contract documents.
The integrated supply team co-ordinates any necessary consultations with user panels, champions, and other stakeholders, including statutory authorities. The integrated supply team then co-ordinates the incorporation of comments received into the developing concept design.
The integrated supply team co-ordinates a design review of the concept design and then co-ordinates any necessary amendments and amends the elemental cost plan and prepares a cash flow projection.
If required by the contract, the integrated supply team prepares design documents describing the concept design for the client (such as a concept design report).
The client considers whether these initial concept design ideas satisfy the requirements of the output-based specification and makes comments (perhaps with the benefit of advice from independent client advisers). NB This can only be done in relation to compliance with the output-based specification. Comments which amount to a change in the output-based specification may be charged for by the integrated supply team and could result in delays to the project.
The client may wish to undertake a value management exercise with the entire integrated project team to ensure that optimum, whole-life solutions are being pursued. If necessary the integrated supply team amends the concept design and then amends the elemental cost plan and cash flow projection.
[edit] OGC decision point 1.
The client considers OGC decision point 1: outline design, and confirms whether the project should proceed to detailed design.
[edit] Making an outline planning application or detailed planning application if necessary.
If no previous applications have been made by the client, the integrated supply team should consider whether to make an outline planning application or detailed planning application. Go to work stage: Public project: planning permission.
⇒ outline plan | previous stage Tender or PFI Tender | next stage
Featured articles and news
Wellbeing in Buildings TG 10/2025
BSRIA topic guide updates.
With brief background and WELL v2™.
From studies, to books to a new project, with founder Emma Walshaw.
Types of drawings for building design
Still one of the most popular articles the A-Z of drawings.
Who, or What Does the Building Safety Act Apply To?
From compliance to competence in brief.
The remarkable story of a Highland architect.
Commissioning Responsibilities Framework BG 88/2025
BSRIA guidance on establishing clear roles and responsibilities for commissioning tasks.
An architectural movement to love or hate.
Don’t take British stone for granted
It won’t survive on supplying the heritage sector alone.
The Constructing Excellence Value Toolkit
Driving value-based decision making in construction.
Meet CIOB event in Northern Ireland
Inspiring the next generation of construction talent.
Reasons for using MVHR systems
6 reasons for a whole-house approach to ventilation.
Supplementary Planning Documents, a reminder
As used by the City of London to introduce a Retrofit first policy.
The what, how, why and when of deposit return schemes
Circular economy steps for plastic bottles and cans in England and Northern Ireland draws.
Join forces and share Building Safety knowledge in 2025
Why and how to contribute to the Building Safety Wiki.
Reporting on Payment Practices and Performance Regs
Approved amendment coming into effect 1 March 2025.